Open Manufacturing System - OMS

Master Production Schedule
Master Production Schedule system provides all the controlling feature on deviate a master production planning in the aspect of WIP center capacity and material requirement availability. Graphical display of the Work Order Loading chart and the report of MRP calculation provides information about the Work Order status in the Master plan.
 

Support Manufacturing Order Entry or Schedule Order from Sales Order;
Provide Work Order generation tools from Manufacturing Orders;
Provides Work Order Entry and correlate as demand in MRP calculation;
Supports WIP center Resources utilization analysis after Work Order Entry;
Supports WIP center Resources parameter entry;
Supports Item production parameter entry;
Full Material Requirement Calculation with driven parameter setting;
Support Three MRP calculation policy - Lot by Lot, Fixed Order and Reorder level;
Support Safety Stock consideration during MRP calculation;
Supports unlimited planning time horizon during MRP calculation;
Integrated with Planner Working Space to generate P.R. from MRP result;
Mass and selective generation of Purchase Requisition from MRP result;
Selective Approval of Purchase Requisition and integrated with Buyer Working Space in Purchase Order Control System;
Support parametric Work Order capacity capability calculation control.

 
 

Enquiries & Reports
Master Production Schedule by Date
Master Production Schedule by Item
Graphical Loading Chart
Graphical Loading Chart by WIP Center
Full MRP calculation report
Net Buy MRP calculation report
Purchase Requisition listing
Approved Purchase Requisition listing

 